By Rich
There is plenty going on down at the boatyard and in the shop. Much of the salon’s headliner has been taken down to chase a variety of small leaks.
After this evening we have a whole bunch of parts ready to be re installed in the boat. The aft head floor boards and door have had their sanded edges varnished to guard against moisture intrusion and are ready to be returned to their homes.